Start Your Engineering Review

Share your project details. We’ll respond with actionable DFM feedback within 24 hours.

Strict NDA Policy

We don't share, we don't copy. Download our standard mutual NDA here before uploading if needed.

Engineer-to-Engineer

Your files bypass the sales desk and go straight to our mechanical engineering team.

24-Hour Turnaround

Expect a preliminary structural audit and quote within one business day.

FAQS

Standard high-precision molds require 3-6 weeks from DFM approval to the First Article Inspection (T1). Mass production lead times typically range from 2-4 weeks, strictly depending on volume, cavity count, and resin availability.

We prioritize engineering solutions over strict MOQs. We fully support low-volume pilot runs (NPI phase) for functional testing and market validation before scaling to millions of units.

Our operations are fully compliant with international quality management systems, specifically engineered to meet the rigorous demands of the automotive (IATF 16949) and medical/healthcare (ISO 13485) industries.

Tooling longevity is designed from the ground up. We use imported, hardened tool steels (e.g., HRC 52+) for all critical wear surfaces. Depending on the SPI classification, our high-volume production molds are guaranteed for up to 1,000,000 cycles with minimal dimensional wear.

Yes. We specialize in complex multi-material assemblies, including metal-to-plastic insert molding for structural integrity, and soft-to-hard overmolding (e.g., TPE/TPU on PC/ABS) for ergonomic or sealing requirements.

Get in touch